MICHELIN DAVYDOVO

MICHELIN DAVYDOVO

 
MICHELIN PLANT LOCATED IN DAVYDOVO
MOSCOW REGION RUSSIA
 

 

 
Name of the customer MICHELIN
Address of the customer Davydovo, Moscow Region
RUSSIA
Nature of the works Heating, Ventilation, and Air Conditioning (HVAC), Mechanical, Piping, Electrical, Instrumentation and Controls (I&C) and Associated Works in Michelin's tire PRODUCTION PLANT LOCATED AT DAVYDOVO, RUSSIA
Address of the Construction site (Work)  
Architect / Project manager  
Address of
the Project manager
 
Value of the total contract 2 535 000,00 €
Duration of the works 10 months
Period of the works March 2003 in December 2003
Description
of the realized works
Object of the works :
  • HVAC Equipment Installation, Ductwork and Air Distribution Devices supply and installation.
  • Ductwork and Air distribution supports to building
  • Heating Hot Water Piping and supports to building
  • Equipment, Ductwork and Piping
  • Pumps, Associated with the HVAC Equipment
  • Electrical power distribution from Panel and Motor Control Centers (MCC)
  • Electrical power distribution conduits, cable trays conduits and supports to building.
  • End consumers
  • HVAC Instrumentation and Controls.
  • Interface to the Building Monitoring System ( out of scope of works )
  • Piping and Piping Supports
  • Piping Insulation
  • Hot Water Heaters
  • Tie-in to fixtures
  • Commissioning



 