Université TOUKRA

 
Construction de l'université
TOUKRA au TCHAD (Phase 1)

 
 

 

 
Name of the customer MINISTERE DES INFRASTRUCTURES
ET DES TRANSPORTS
Address of the customer N'DJAMENA TCHAD
Nature of the works CONSTRUCTION UNIVERSITE TOUKRA PHASE N°1
N'JDAMENA

HVAC – PLUMBING – BOILER HOUSE
Address of the Construction site (Work) N'DJAMENA TCHAD
Architect / Project manager Technologia-Architettura-Urbanistica / Entreprise CFE
Address of
the Project manager
Dott. Ing. Roberto A. Sechi
N'Djamena – BP 1869 TCHAD
Via Crispi 28 – Varese ITALY

N'Djamena – BP 6423 TCHAD
Avenue Hermann Debroux, 42
1160 Bruxelles BELGIQUE
Value of the total contract 6 900 000,00 €
Duration of the works 24 months
Period of the works July 2010 in April 2012
Description
of the realized works
Object of the works :
  • Boiler House fitted with gas burners
  • Fire Fighting System (Hydrants + Sprinkler network)
  • Production of sanitary hot water
  • Heating networks
  • End consumers
  • Air exhaust
  • Ventilation of office areas and utility spaces
  • Cooling equipment
  • Water supply networks
  • Air conditioning
  • Setting to work, testing, adjusting
     


 
[ voir toutes nos réalisations ]
 
Les Fililales
du groupe
utiliser les flèches pour défiler
Cunin Fluides
Cunin Couverture
Cunin Maintenance
La Robinetterie
Cunin Export
Cunin Russie
Cunin Chine
Enertex
Eseleq
Cunin Algérie
Brocard SARL
Cunin SARL
Cunin Industrie
Imaginé par NEFTIS - CMS : Flexit©