CONSTRUCTION DISPATCHING AREVA/EEPCO

CONSTRUCTION DISPATCHING AREVA/EEPCO

 
CONSTRUCTION DISPATCHING
AREVA/EEPCO

 
 

 

 
Name of the customer AREVA/EEPCO
Address of the customer Addis Abeba
ETHIOPIA
Nature of the works ELECTRICAL/MECHANICAL TECHNICAL
Electrical work, high and low voltage
Address of the Construction site (Work) EEPCO
ADDIS ABEBA
ETHIOPIA
Architect / Project manager ALSTOM GRID / EDF PARIS
Address of
the Project manager
102, Avenue de Paris
91741 - MASSY
FRANCE
Value of the total contract 4 500 000,00 €
Duration of the works 32 months
Period of the works 2007 – 2008 - 2010
Description
of the realized works
Object of the works :
  • Boiler house fitted with gas burners
  • Fire fighting system(hydrants sprinkler network )
  • Production of sanitary hot water
  • Heating networks
  • End consumers
  • Air exhaust
  • Ventilation of office areas and utility spaces
  • Cooling equipment
  • Water supply networks
  • Air conditioning
  • Setting to work, testing, adjusting



 
[ See all realizations ]
 
The Group's
subsidiaries
Use the arrows to scroll
Cunin Fluids
Cunin Roofing
Cunin Maintenance
La Robinetterie (The Plumbing fitting)
Cunin Exportation
Cunin Russia
Cunin China
Enertex
Cunin Algeria
Brocard SARL
Cunin SARL
Cunin Industry
Imaginé par NEFTIS - CMS : Flexit©